早教吧 育儿知识 作业答案 考试题库 百科 知识分享

英语翻译沙垄平缓部分挖土以推土机推土为主;沙丘部分先以挖掘机挖土,再用推土机推平;场内部分土方和外购土方考虑装载机与自卸车装运,用推土机推平时来回行驶进行碾压,再用压路机

题目详情
英语翻译
沙垄平缓部分挖土以推土机推土为主;沙丘部分先以挖掘机挖土,再用推土机推平;场内部分土方和外购土方考虑装载机与自卸车装运,用推土机推平时来回行驶进行碾压,再用压路机压实.
还有一部分:
总平面布置拟划分为工艺装置区、硫磺堆场区、厂前区、总变电站、锅炉房、消防区、中央控制区、火炬区、污水蒸发池等九个区块
▼优质解答
答案和解析
译文(修改后) :
Flattening some digging sand ridge to Bulldozing mainly sand dunes of the first to use excavators digging,and then bulldozed; part of the Turkish side at the earthwork and consider outsourcing loader and dump truck shipments,bulldozed peacetime travelling back and forth for RCC,and then roller compaction.
General layout of devices to be divided into zones,sulfur Yard,the former factory district,the substation,boiler room,fire district,central control,torch,sewage evaporation ponds nine blocks.