帮翻译,软件的就免了
Page 4 weekly visualized progress of completion:
Item “c” Window frames and glass 70% completed – what is the completion date?
Item “e” I’m concerned with the wall painting quality without any heat.
Item “n” heating system 90% completed. How will testing be conducted without gas connection? When is the connection date for the gas?
Item “o” pressure testing of fire piping. Was GRC present for testing, and what were the results?
▼优质解答
答案和解析
第四页 可视进度:
项目C: 窗框和玻璃完成了70%-全部完成的日期是?
项目E: 没有热烘的话,我很关心壁画的质量.
项目N: 供热系统完成了90%.如果不通气,怎么进行测试呢?通气的日期是什么时候?
项目O: 消防管道压力测试.GRC目前是在被测试,结果是什么?
绝不是软件.