英语翻译麻烦兄弟姐妹们帮我翻译一下Top10failureofproductSafetyaudit1.Noprovidelockingdeviceforincomingmaterialin“Justloading&waitingfortesting”+“Testpassed&readyforproduction”.Furthermore,noname&ph
题目详情
英语翻译
麻烦兄弟姐妹们帮我翻译一下
Top 10 failure of product Safety audit
1.No provide locking device for incoming material in “Just loading & waiting for testing” + “Test passed & ready for production”.Furthermore,no name & photos of assigned person that only allowed to work in warehouse
2.No Bill of Material (BOM) for all incoming material to ensure putting correct materials into bulk production.
3.No label to show trims status in incoming warehouse
4.No records to verify trim distribute to which buyer,which style # & which PO#.
5.Poor control of Trim attachment process (No label of machine,not follow trim data sheet to setup machine,no quarantine area to segregate every batch with label,no mock up test)
6.Poor storage of trim in trim attachment process (No clean up & return the remainder trims to their line leader after work & get mix-up,poor storage of trims – mix-up with other style & batches without label).
7.Poor handling of paint (no batch code,no formula,no label on paint containers,dirt environment & tools to cause contamination,not use stainless steel tools,Have MSDS)
8.Poor sharp tools & needle control (incorrect stock I/O records with actual,insufficient data on broken needle records,no tied sharp tools,no checking tips on sharp tools – because it still can use,found broken needle in sewing machine,no follow up action & procedure when missing broken needle & sharp tools,remove needles for no use machines)
9.Poor control of needle detection (No needle free zone,not place the test specimen on lower 3 points,no reserves area to identify separate the batches between 2 calibration intervals,no follow up action & procedure when get alarm)
10.Poor traceability system (Cannot trace back from finished carton to raw material – test reports,inspection reports,purchase order to trim supplier,delivery note).TCP QA would do the BOM Exercise to ensure factory have traceability system
麻烦兄弟姐妹们帮我翻译一下
Top 10 failure of product Safety audit
1.No provide locking device for incoming material in “Just loading & waiting for testing” + “Test passed & ready for production”.Furthermore,no name & photos of assigned person that only allowed to work in warehouse
2.No Bill of Material (BOM) for all incoming material to ensure putting correct materials into bulk production.
3.No label to show trims status in incoming warehouse
4.No records to verify trim distribute to which buyer,which style # & which PO#.
5.Poor control of Trim attachment process (No label of machine,not follow trim data sheet to setup machine,no quarantine area to segregate every batch with label,no mock up test)
6.Poor storage of trim in trim attachment process (No clean up & return the remainder trims to their line leader after work & get mix-up,poor storage of trims – mix-up with other style & batches without label).
7.Poor handling of paint (no batch code,no formula,no label on paint containers,dirt environment & tools to cause contamination,not use stainless steel tools,Have MSDS)
8.Poor sharp tools & needle control (incorrect stock I/O records with actual,insufficient data on broken needle records,no tied sharp tools,no checking tips on sharp tools – because it still can use,found broken needle in sewing machine,no follow up action & procedure when missing broken needle & sharp tools,remove needles for no use machines)
9.Poor control of needle detection (No needle free zone,not place the test specimen on lower 3 points,no reserves area to identify separate the batches between 2 calibration intervals,no follow up action & procedure when get alarm)
10.Poor traceability system (Cannot trace back from finished carton to raw material – test reports,inspection reports,purchase order to trim supplier,delivery note).TCP QA would do the BOM Exercise to ensure factory have traceability system
▼优质解答
答案和解析
要睡觉了,写到哪里算哪里
一、未在“开机登录、等待自检、测试通过、准备生产”的环节设置进料控制(锁闭)装置,此外,未提供被允许进入仓库人员的名字或照片
二、未能提供全部采购物料的BOM表(材料清单)来确保正确的物料保证大货生产
三、来料仓缺少显示辅料状况的标签
四、未能提供用于核对辅料分发的记录,比如发给哪个客人、是哪种产品、哪种型号、哪张PO(订单)
五、辅料的附属加工过程缺少控制.
汗~这个工厂的管理够差的,多少得给审核员一些意思嘛
一、未在“开机登录、等待自检、测试通过、准备生产”的环节设置进料控制(锁闭)装置,此外,未提供被允许进入仓库人员的名字或照片
二、未能提供全部采购物料的BOM表(材料清单)来确保正确的物料保证大货生产
三、来料仓缺少显示辅料状况的标签
四、未能提供用于核对辅料分发的记录,比如发给哪个客人、是哪种产品、哪种型号、哪张PO(订单)
五、辅料的附属加工过程缺少控制.
汗~这个工厂的管理够差的,多少得给审核员一些意思嘛
看了英语翻译麻烦兄弟姐妹们帮我翻译...的网友还看了以下:
英语达.请把下列个题中的字母组成一个你所学过的单词.o,m,w,l,c,e,ee,g,h,t,io 2020-05-13 …
同阶无穷小量的表示方法?急!还有f(x)=O(g(x))是什么意思?老师说f(x)=h(x)g(x 2020-06-05 …
谁帮我做下下面的关于时间复杂度的习题?f(n)=100n^3+n^2+1000,g(n)=25n^ 2020-06-12 …
只有f(-o)=f(0)=-f(0)=0这种情况是:既是偶函数也是奇函数吗?对于像是这种情况f(x 2020-07-30 …
一个有关大O(阶)的问题求两个单调递增函数f(n)和g(n)(n为自然数),f(n)≠O(g(n) 2020-07-31 …
设f(N)、g(N)是定义在正数集上的正函数.如果存在正的常数C和自然数N0,使得当N≥N0时有f 2020-07-31 …
两道关于函数的增长的证明题1.证明:f(n)=n^100,对g(n)=2^n是O(g)的,但g不是 2020-08-01 …
高数问题设函数f(x,y)在点(0,0)的某领域有定义,且fx(o,o)=3,fy(0,0)=-1, 2020-11-01 …
⊿ABC的三个顶点都在⊙O上,AD,BE是高,交点为H,BE的延长线交⊙O于F,下列结论:⊿ABC的 2020-12-23 …
求解几道函数题已知函数F(X)=3X方-5X+2,求F(-根号2),F(-A),F(A+3),F(A 2020-12-31 …