早教吧作业答案频道 -->英语-->
英语翻译1.基础地基承载力远小于设计要求2.为保护K0+100右侧的古寺3.基底软基采用抛石挤淤处理,并将原设计分离式变更为整体式基础4.对该路段进行改线设计,新线位于老线左侧,并相应增加
题目详情
英语翻译
1.基础地基承载力远小于设计要求
2.为保护K0+100右侧的古寺
3.基底软基采用抛石挤淤处理,并将原设计分离式变更为整体式基础
4.对该路段进行改线设计,新线位于老线左侧,并相应增加涵洞及排水设施
5.圆管涵洞口边坡防护坡度和砌筑厚度不符合设计要求
6.盖板暗沟铺底厚度不符合设计要求
7.挖方段左侧排水沟浆砌片石墙身施工时,片石几何尺寸不符合要求、砂浆不饱满并且砂浆质量极差
1.基础地基承载力远小于设计要求
2.为保护K0+100右侧的古寺
3.基底软基采用抛石挤淤处理,并将原设计分离式变更为整体式基础
4.对该路段进行改线设计,新线位于老线左侧,并相应增加涵洞及排水设施
5.圆管涵洞口边坡防护坡度和砌筑厚度不符合设计要求
6.盖板暗沟铺底厚度不符合设计要求
7.挖方段左侧排水沟浆砌片石墙身施工时,片石几何尺寸不符合要求、砂浆不饱满并且砂浆质量极差
▼优质解答
答案和解析
1.The foundation foundation loading dint is farer small than a design to request
2.For protect the ancient temple of K 0+100 right sides
3.The base soft radicle adoption throws crowded Yu of stone to handle,and will design a separation type to modify into whole type foundation at first
4.Carry on changing a line design to the road's segment,the new line is located in an old line left side,and correspond to increase culvert and catchment facilities
5.The circle takes care of a culvert side ascent protection slope and carve to build thickness to not agree with to match a design request
6.Cover plank covered sewerage to spread bottom thickness to not agree with to match a design request
7.Dig a square segment left side drain when the ditch syrup carve a slice of stone wall body construction slice the stone is several what the size not agree with to match to request,the sand strach not full and the sand strach the quality differ very much
2.For protect the ancient temple of K 0+100 right sides
3.The base soft radicle adoption throws crowded Yu of stone to handle,and will design a separation type to modify into whole type foundation at first
4.Carry on changing a line design to the road's segment,the new line is located in an old line left side,and correspond to increase culvert and catchment facilities
5.The circle takes care of a culvert side ascent protection slope and carve to build thickness to not agree with to match a design request
6.Cover plank covered sewerage to spread bottom thickness to not agree with to match a design request
7.Dig a square segment left side drain when the ditch syrup carve a slice of stone wall body construction slice the stone is several what the size not agree with to match to request,the sand strach not full and the sand strach the quality differ very much
看了 英语翻译1.基础地基承载力远...的网友还看了以下:
已知抛物线:y=x^2+kx-3/4k^2 设抛物线与x轴交与m.n,若这两点到原点的距离分别是O 2020-05-13 …
给出三个命题:1.点P(B,A)在抛物线Y=X^2+1上;2.点A(1,3)能在抛物线Y=AX^2 2020-05-17 …
已知抛物线C1:y=2ax2-bx-1经过(1,-2)和(3,2)两点.(1)求抛物线C1的解析式 2020-06-11 …
已知抛物线y=ax^2+2x+c的图像与x轴交于点A(3,0)和点c,与y轴交于点B(0,3)已知 2020-07-09 …
如图,已知抛物线y=1/3X^2+bx+c经过A(-√3,0),B(0,3),如图,已知抛物线y= 2020-07-09 …
已知顶点为P的抛物线a:y=1/3(x+2)²上有一点A(1,3)(1)试写出抛物线a的顶点坐标和 2020-07-10 …
在平面直角坐标系xOy中,抛物线C:y=x2+(3-m)x经过点A(-1,0).(1)求抛物线C的 2020-07-21 …
抛物线的顶点在原点,它的准线过椭圆C:x^2/a^2+y^2/b^2抛物线的顶点在原点,它的准线过 2020-07-31 …
1.判断题x^2+y^2+6x-7=0与抛物线y^2=4x的准线的位置关系2.抛物线y^2=2px( 2020-11-01 …
九年级下第二十六章复习题26第六题6.根据下列条件,分别确定二次函数的解析式:(1)抛物线y=ax^ 2020-12-13 …