PMP,Tell me the answer and why
Your oldest daughter recently returned from demonstrating at a meeting of the World Trade organization and announced that she is dedicating her life to disrupting major development projects sponsored World Bank.She asserts that these types of projects destroy the environment and enslave the local population to a life of meaningless and degrading work.Your company happens to be bidding on a World Bank project with a requirement to perform an environmental impact study before beginning construction.The requirement to perform such a study represents
A.The impact that demonstrations can have on international affairs
B.A project constraint
C.A factor that needs to be taken into consideration as part of the bid-no bid decision
D.An example of complying with international law
Your oldest daughter recently returned from demonstrating at a meeting of the World Trade organization and announced that she is dedicating her life to disrupting major development projects sponsored World Bank.She asserts that these types of projects destroy the environment and enslave the local population to a life of meaningless and degrading work.Your company happens to be bidding on a World Bank project with a requirement to perform an environmental impact study before beginning construction.The requirement to perform such a study represents
A.The impact that demonstrations can have on international affairs
B.A project constraint
C.A factor that needs to be taken into consideration as part of the bid-no bid decision
D.An example of complying with international law
▼优质解答
答案和解析
B. A project constraint
环境影响分析是requirement,项目的要求,即项目制约因素
环境影响分析是requirement,项目的要求,即项目制约因素
看了PMP,Tellmethean...的网友还看了以下:
英语翻译由于level不够的原因年初没有在GEMS系统里做设定目标,所以现在提交不了,只是在线下做 2020-05-13 …
P,MP,PMP,MPMP,PMPMP分别代表什么意思聪明的你一定会知道的对不对? 2020-07-20 …
PMP项目章程在收尾工作时的用处?以下哪项描述了在工作完成时,项目章程被用来:A.确保所有的团队成 2020-07-20 …
PMP考试题求助一个项目有下列风险:5%的概率需要增加接受测试,造成3个星期的延误;50%的概率下软 2020-11-03 …
PMP测试题某个新产品研发项目,预计投资200万美元.该产品未来市场前景很好的概率为50%,可收入1 2020-12-04 …
承认书checklist里的PMP是什么意思? 2020-12-10 …
今年两会上PMp.少成为热点名词,PMp.少是指大气中直径小于或等于p.少微米的颗粒物,可被吸入肺部 2021-01-01 …
P————————————————屁MP———————————————马屁PMP—————————— 2021-01-01 …
PMP,TellmetheanswerandwhyYouroldestdaughterrecentl 2021-01-01 …
PMP考题求解,答案为B,求解释1.活动A的工期为3天,始于4号,星期一的早上.后续活动B与活动A之 2021-01-01 …